Product Code: 112282960

Address:

Shandong,China

Main Products:

Education equipment,Teaching Equipment,science laboratory equipment,mechatronics training Equipment,elevator trainer,position control trainer,robot trainer,Industrial Automation Training set,PLC Training set,Inverter Training set,Pneumatic and hydrau

Contact Info.
Factory Electricity Supply and Distribution Automation Training and Teaching equipment model
  • FOB Price
    US $ 100.00 / Set(s)
  • Min. Order
    10 Set(s)
  • Payment Terms
    -- --
  • Port
    Qingdao Port
  • Delivery Time
    30 days after payment
  • Place of Origin:
    Shandong China (Mainl...
  • Brand Name:
    XingKe
  • Model Number:
    XK-GD2
  • Experiment e...:
    Teaching apparatus
  • Technical Tr...:
    Educational equip...
  • Teaching aid...:
    Technical teaching mo...
  • Lab Teaching...:
    Experiment equipment
  • Teaching equ...:
    educational training ...
  • education an...:
    experimental ...
  • school supplies:
    office school supplie...
  • plc training...:
    technical teaching eq...
  • lab equipment:
    Didactic training equ...
  • Science lab ...:
    Electrical training k...
Product Description

XK-GD2 factory electricity supply and distribution automation experiment training system

1    Experiment system overview

XK-GD-II factory electricity supply and distribution automation experiment training system is developed combining to latest distribution automation technology to meet the requirements of relevant courses experiment teaching of Power supply and distribution technology, Factory electricity supply, Distribution automation, Relay protection of power supply system, Microcomputer protection in power supply system, Electrical drawing, etc. This system has better comprehensiveness, and audio-visual experiment phenomenon. It is convenient to use and to configurate. It can not only use independently, but also form to large-scale distribution network by many sets, and configurate to small size scheduling and monitoring system. This system can be well opened and researched, it is suitable for experiment teaching of relevant courses and training of students’ practice skills, and can also act as open platform of students’ course design and graduation project and platform of professional people mounting guard training.

 

2     System composition

1)    Transformer substation

2)    Substation screen in workshop (user’s substation screen)

3)     Control cabinet with relay protection

3     System Functions

       1)    Secondary circuit experiment

       1) Breaker control and signal circuit experiment

       2) Secondary control circuit wiring, manual switch on-and-off experiment

       3) Secondary control circuit tripping prevent and disconnection prevent experiment

2)    Microcomputer automatics experiments

1) Automatic putting into experiment of emergency power supply for inlet wire

2) Automatic putting into experiment of emergency power supply for Busbar

3) Reactive control experiment of circuit

4) Manual/auto power factor compensation experiment

5) RC reactive compensation experiment

6) Under-voltage load shedding experiment of microcomputer

       3) Conventional relay characteristic and protection experiment

       1) Current relay characteristic test

       2) Voltage relay characteristic test

       3) Time relay characteristic test

       4) Current quick-breaking experiment

       5) Over current protection experiment taking with time limit

       6) Low-voltage starting over current protection experiment

7) Current quick-breaking protection experiment of transformer

       8) Over current protection experiment of transformer

       9) Over load protection experiment of transformer

4     Microcomputer protection experiment

       A    Microprocessor based relay protection experiment of circuit

       1) Current quick-breaking protection experiment

       2) Time limit current quick-breaking protection experiment

3) Fixed time-lag over current protection experiment

4) Inverse time lag over current protection experiment

5) Interlock protection experiment of current and voltage

6) Voltage lock-out over current protection experiment

7) Single-phase grounding insulation monitoring experiment

B  Microprocessor based relay protection experiment of transformer

1) Over current protection experiment of transformer

2) Under voltage starting transformer over current protection experiment     

3) Multiple voltage starting transformer over current protection experiment

4) Over load protection experiment of transformer

C  Microprocessor based relay protection experiment of motor

1) Motor quick-breaking protection experiment

2) Negative sequence motor over current protection experiment

3) Inverse time lag motor over current protection experiment

4) Single-phase grounding protection experiment of motor

5)Under voltage protection experiment of motor

D    Capacitor micro-processor based protective delay experiment

1) Capacitor current quick-breaking protection experiment

2) Capacitor over current protection experiment

3) Unbalanced current protection experiment of capacitor

4) Unbalanced voltage protection experiment of capacitor

5) Over voltage protection experiment of capacitor

6) Under voltage protection experiment of capacitor

5     Power distribution operation appraisal

1)     Transfer switching check of factory electricity supply simulation

2)     Power transmission and power cut operation appraisal

6      35kV transformer substation total automation experiment

1)Four-remote experiment(remote communication, remote control, remote sensing and remote regulating)

2)SACDA ( supervisory control and data acquisition) function experiment of transformer substation